With Time Tracking, you have the ability to record the time you’ve spent working on a Project in KaiNexus.

NOTE: Time Tracking must be enabled for each template. Reach out to your Customer Experience Lead to take advantage of this feature.

When Time Tracking is enabled for a template, a new “Time Tracking” section will be added to each item of that type. It will typically be placed under the “Dates” section, but if the template has a customized layout, it will appear in the set location and will be added to the “Other” tab.

Time_tracking.jpg

 

Who can add time or edit or delete existing work logs?

Anyone who can add files or links to the Project. That includes:

  • Sponsors

  • Facilitators

  • Leaders

  • Participants

  • Anyone with the “Project Administrator” permission

NOTE: Once an item is complete, you cannot add time without first reopening it.

 

How do I add an estimate?

Open the Project with which you want to work, then:

  • Click 2018-05-01_2326.png in the top right corner of the page.

  • In the resulting drop-down menu, click 2018-05-01_2327.png.

Project_-_add_estimate.jpg

 

In the resulting window:

  • Enter the amount of time you estimate will be needed in the “Amount” field.

  • Select the unit of time - choose between hours and minutes.

  • Click 2018-04-30_1131.png.

 

How do I update the estimate?

Open the Project with which you want to work, then:

  • Click 2018-05-01_2326.png in the top right corner of the page.

  • In the resulting drop-down menu, click 2018-05-01_2327.png.

Project_-_add_estimate.jpg

 

In the resulting window:

  • The original estimate will be displayed. You can edit its number value and its unit of measurement if necessary.

  • You can also update the estimate by updating the information under “Remaining Time Needed.” Doing so will add a new estimate based on the value entered, although the old estimate will still be visible

  • Click 2018-04-30_1131.png.

 

How do I log work?

Open the Project with which you want to work, then:

  • Click 2018-05-01_2326.png in the top right corner of the page.

  • In the resulting drop-down menu, click 2018-05-02_1012.png.

Project_-_log_work.jpg

 

In the resulting window:

  • Select the name of the person who did the work in the “Person” drop-down.

  • Enter the amount of time spent in the “Amount” field and the unit of time - hours or minutes.

  • Enter the date and time on which work began in the “Work Log Date” field.

    Be sure to format your entry in the “M d, Y hh:mm AM/PM” format. For example, you could enter “May 03, 2018 01:00 PM.”

  • (**Optional**) Enter a description of the work done in the “Description” field.

  • Click 2018-04-30_1131.png.

 

How do I view, edit, or delete logged work?

Open the item with which you want to work, then click 2018-05-02_1026.png in the top right corner of the “Time Tracking” section.

Expand_time_tracking.jpg

In the resulting window:

  • You’ll see every work entry that has been logged so far.

  • Click 2018-05-02_1028.png in the top right corner of the window to update the estimate.

  • Click 2018-05-02_1029.png in the top right corner of the window to log work.

  • Hover over the entry you want to edit so that it is highlighted blue, then click 2018-05-02_1030.png to its right.

  • Hover over the entry you want to delete, then click 2018-05-02_1030_001.png to its right.

NOTE: Once the Project has been completed, you will be unable to edit the estimate, log work, or edit or delete any Time Tracking entries.

 