Location Project Cycle Time Report

This Report allows you to monitor the Project cycle time - how long Projects are spending in each status - on a per Location basis.

Location_Project_Cycle_Time.jpg

 

Working with the Report

  • The date range options are listed along the top of the page. Choose between 1 week, 1 month, 3 months, 6 months, 9 months, 12 months, all time, or a custom range by clicking on the corresponding option.

  • Beneath the date ranges are three additional options:

    • Click "All" to include all Projects that meet the rest of the filter requirements.

    • Click "Project-Based" to include only Projects that meet the rest of the requirements and are nested under another Project.

    • Click "Stand-Alone" to include only Projects that meet the rest of the requirements and are not nested under a Project.

  • Pick a Level Type (or Types) in the "Level Type" field to list only Locations of a certain type on the Report.

  • The Network diagram can be found along the left side of the page. Use this to filter the Report by Location - only items tied to the selected Locations will be included in the Report.

  • Click 2018-10-03_1253.png near the top of the Report to open the advanced filters.

You can also:

  • Click any of the data points or status bars on this Report to open the list of Projects it is counting. If you don't have the adequate permissions to view them, some items will be excluded from the list.

  • Export the Report to an Excel spreadsheet by clicking 2018-04-25_1238.png near the bottom left corner of the page. 

 

Things to look for:

  • Locations within your organization that are taking significantly longer to implement Projects than other Locations. People in these Locations may need additional coaching about the importance of timely Projects and Lean in general.

 